Machine connectivity
Assess installed PLCs, drives, instruments and available interfaces. Identify the additional signals needed without assuming every existing machine must be replaced.

Demo shift 08:00–16:00 · 8 / 8 running at last illustrative sample
Every reading, recipe, production quantity and score is illustrative.
No live machine connection.
Select a machine to explore its process and OEE demonstrations.
Drum Twister 90 min · Stranding 80 min · CCV 70 min
A = Availability · P = Performance · Q = Quality
450 planned minutes per machine. Output stays separate by machine.
Fleet OEE = sum(released first-pass good output ÷ recipe ideal rate) ÷ sum(planned machine-minutes). This dataset gives 2,677.54 good-equivalent minutes ÷ 3,600 planned machine-minutes = 74.38%.
Do not add single-wire metres, wire-metres and finished axial lengths, or average rounded machine percentages. Multi-wire drawing uses 16 approved wires × 30 m/s × 60 = 28,800 wire-m/min. Performance uses total output across the run, not the last sampled speed.
Pending quality release is neither confirmed good nor confirmed scrap. This demo excludes holds from good and labels affected machine and fleet scores provisional. Later disposition must remain linked to the original drum and production period.
Simatech brings together automation engineering, machine connectivity and custom industrial software. Start with a selected line, validate the measurements, then define a plant-wide rollout.
Assess installed PLCs, drives, instruments and available interfaces. Identify the additional signals needed without assuming every existing machine must be replaced.
Define recipe-specific rates, shift calendars, downtime reasons and machine-specific units. Develop process screens, OEE dashboards and shift reporting.
Link good, rejected and held lengths to drum or segment identity. Record trends and retain disposition revisions with a traceable history.
Engineer PLC/HMI/SCADA interfaces, data collection, databases and reporting applications. Assess MIS, MES or ERP integration where interfaces are available.
Commissioning includes signal mapping, counter-reset handling, mutually exclusive time states, stale-data indication and validation against production records. Zero denominators must show “not available”; unexpected results require review, not automatic clipping.
Planning a controls upgrade as well? Explore Retrofit, Migration & Upgradation.
The interactive demonstration follows the same synthetic production dataset and machine-specific readings.
Complete 8-machine fleet OEE summary, shift availability, downtime distribution, and energy totals.
ViewMachine-by-machine process parameters, production disposition, OEE audit tables, and downtime breakdowns.
ViewShare your country, machine types, number of lines, existing controllers, available signals and the production reports you need. We will define a project-specific assessment and implementation scope.